A number, its unit, its period, its client
"+300% growth" says nothing. Here is the rule behind every result published on this site.
A result answers four questions: how much, of what, over what period, for whom. If one is missing, the number cannot be checked.
A complete example
GSING Djerba, an IB school, enters its admissions peak with 9 students enrolled. Three months later, it has 132. The detail:
- 400 applications received;
- 33% conversion, from application to enrolment;
- $27 cost per acquisition;
- 88% of capacity filled.
Each line carries its unit. The period is stated: three months. The client is named. Readers can redo the maths: 132 enrolments out of 400 applications is indeed 33%.
What a percentage hides
A percentage on its own always flatters. Going from 9 to 132 enrolments is an increase of more than 1,300%. The number is exact, and it says nothing about the size of the school. That is why I show both values, 9 and 132, rather than their ratio.
When the number is missing
When a system has just gone into production, its result is not measured yet. In that case, I publish what can be checked, what has shipped and what is running, and nothing else. I would rather leave a cell empty than publish an estimate.
The rule, in one line
Every published number carries its unit, its period and its client. It is also what I ask of you at the start of a mandate: the result you are after, with a number.
02 Mandate
What number are you after?
Describe the result you need to hit. I read every request myself and reply within 48 hours.

Before you write
How much does a mandate cost?
Each stage has its own price: scoping, the build, then a monthly fee for operation.
How long does it take?
The deadline is set during scoping, working back from yours: a school year, a season, a launch.
What happens after delivery?
The system moves into operation: it is measured, adjusted and extended, month after month.
Is my information kept confidential?
Your request is used only to reply to you.
Four questions, two minutes.